@article{Kharisma_Purnomo_Kuncahyo_2022, place={Bogor, ID}, title={Ecological footprint and biocapacity analysis of upper Cisadane Watershed }, volume={12}, url={https://jurnal.ipb.ac.id/index.php/jpsl/article/view/36105}, DOI={10.29244/jpsl.12.2.197-209}, abstractNote={<p><em>The Ecological footprint/EF is used as a tool to measure human consumption of the resource when compared they ability to regenerate. EF measures how much bio-productivity (BC) areas are needed by the population for sustainable resource production activities that are used to meet the needs and absorb the resulting waste. If EF over then BC, overshoot will be happened. Overshoot usually occurs short term but if continuously increasing will cause environmental degradation. Cisadane watershed became study area because it was part of government program to minimize environmental degradation. The purpose of this study was determining the condition of the upstream Cisadane watershed, whether the ecology is surplus or deficit. The result of study explained that upstream Cisadane watershed was ecology deficit from 2016-2020.</em></p&gt;}, number={2}, journal={Jurnal Pengelolaan Sumberdaya Alam dan Lingkungan (Journal of Natural Resources and Environmental Management)}, author={Kharisma, Resti and Purnomo, Herry and Kuncahyo, Budi}, year={2022}, month={Jun.}, pages={197-209} }